





Following the trip to the Solar Decathlon in DC, I came back with an entirely new mind frame with exciting and new ideas....therefore, I decided to build the structure closer to my schematic design; who took the shape of steps. Previously, I felt that this design would be better suited for a building on a GRAND:er scale, but i think i can make it work. Therefore, I moved on to ideation #2, with only 2 days til deadline.
No comments:
Post a Comment